LeanActivity.

Guide · Continuous Improvement

Kaizen Workshop: How to Run One in 6 Steps

Six steps, the right people and a timed agenda you can copy: how to run a Kaizen workshop that ends with a better process, not a list of ideas.

12 min read · By the LeanActivity team

The short answer

A Kaizen workshop is a short, focused session in which the people who do the work improve one process together. Half a day to two days, in three moves:

  1. 1Understand

    One problem, one measurable target and a walk through the real process to see and time it.

    Steps 1–3
  2. 2Improve

    Mark the waste, find the root causes and try the best ideas right away, measured against the start.

    Steps 4–5
  3. 3Make it stick

    Write the new standard, give every open point an owner and check the result after 30 days.

    Step 6 and follow-up
Build your agenda below in one minute, and start the day with a short Lean game, so everyone sees waste the same way.

Basics

What a Kaizen workshop is, and when it fits.

Kaizen means continuous improvement in small steps (see our glossary entry on Kaizen). A Kaizen workshop concentrates that idea into a few hours or days: a small team of the people who do the work takes one process, measures it, removes waste and leaves with a better way of working.

The terms are used loosely. The Lean Enterprise Institute treats Kaizen workshop, Kaizen event and Kaizen blitz as the same thing (Lean Lexicon, LEI). In many companies, though, a workshop is the shorter format for one problem, and a Kaizen event the three to five day format in which machines or layouts move.

Daily Kaizen, Kaizen workshop and Kaizen event compared
Daily KaizenKaizen workshopKaizen event (blitz)
DurationMinutes, every dayHalf a day to 2 days3 to 5 days
ScopeOne small problem at the workplaceOne problem or one process stepOne whole process, often with layout changes
TeamThe team at its board5–8 people, facilitator, sponsor6–10 people, support functions, sponsor
PreparationNone1–2 weeks2–4 weeks
Typical resultA small fix, done todayA new standard for one process stepA redesigned process, e.g. a new cell
Our own comparison of common practice; the boundaries are not fixed.

6 steps

How to run a Kaizen workshop in 6 steps.

Each step comes with a quick check you can do before you move on, and a worked example from a changeover workshop. The example figures are illustrations: put in your own.

Understand

1Pick one problem and a measurable target

“Improve assembly” is a wish. “Halve the search time at station 3” is a workshop. Choose a problem that matters to the customer or the team, is small enough for the time you have and can be measured today.

Quick check

Can you say the target in one sentence, with a number and a date?

Worked example

“Cut the changeover on press 4 from 45 to 30 minutes by the end of the workshop.”

2Invite the right people

Five to eight people: those who do the work, from every shift involved, one person from another area and a facilitator. Support functions stay on call, and the sponsor opens the day and comes back for the report-out.

Quick check

Does at least half of the group do this work every day?

Worked example

Two setters from early and late shift, one operator, one maintenance technician, one colleague from logistics as fresh eyes, a facilitator.

3Go and see

Leave the meeting room and walk the process at the gemba. Time each step several times, count the work waiting between steps, draw the walking paths and film one full cycle.

Quick check

Do you have figures from today, measured by the team, not from a report?

Worked example

Five changeovers timed: 38 to 52 minutes, 11 of them spent fetching tools and parts.

Improve

4Find the waste and its root cause

Write every waste on a sticky note, one colour per type: waiting, walking, transport, searching, overprocessing, stock, defects and unused ideas (the 8 wastes). Cluster them, then ask “why?” until you reach a cause you can change, for the three biggest.

Quick check

Does every top problem have a cause you could switch off, not just a symptom?

Worked example

Why do setters search? Tools are not at the press. Why? No fixed place since the last layout change. Fix: a shadow board at the press.

5Try ideas right away

Collect ideas silently first, then sort them on an impact/effort grid. Try the best ones the same day, in small PDCA cycles: change, run, measure, keep or adjust. A tried idea beats ten debated ones.

Quick check

Did you measure the trial with the same method as the current state?

Worked example

A shadow board and a pre-kitted trolley: the next changeover takes 31 minutes, fetching drops from 11 to 2 minutes.

Make it stick

6Make it the standard and follow up

Write the new way down as standard work, one page with photos, and train everyone who works in the process. What is not finished goes on an action list with an owner and a date. The team presents the result to the sponsor.

Quick check

Could a colleague from another shift work the new way tomorrow without asking?

Worked example

A one-page standard with photos at the press, a trolley check in the shift handover, a review after 30 days: 33 minutes on average.

Agenda builder

Build your Kaizen workshop agenda.

Choose the format and the start time; the agenda adapts, with breaks, the output of every block and a version to copy into your invitation. It runs in your browser, nothing is sent or stored.

Format

Your agenda

Kaizen workshop: your process

  1. 08:30–08:45Welcome, goal and rolesWhy this process, what the target is, who decides what. The sponsor opens, the facilitator runs the day.→ Everyone knows the goal
  2. 08:45–09:30Lean game: see waste in actionA short simulation round, then one change and a second round. The team sees waiting, searching and rework with fresh eyes.→ Shared language for waste and flow
  3. 09:30–10:45Current state at the gembaWalk the process in pairs. Time every step, count work in progress, film one cycle.→ Current state with real figures
  4. 10:45–11:00Break
  5. 11:00–11:45Map the process, mark the wasteDraw the steps on a wall. Mark waiting, walking, searching, rework and hand-overs.→ Process map with waste marked
  6. 11:45–12:30Lunch
  7. 12:30–13:15Root causes5 Whys or a fishbone diagram for the three biggest problems.→ Root causes, not symptoms
  8. 13:15–13:55Ideas and choiceBrainstorm silently first, then sort on an impact/effort grid and choose.→ 3–5 ideas to try
  9. 13:55–14:10Break
  10. 14:10–15:25Try it at the gemba (PDCA)Make the change for real, run the process, measure with the same method as in the morning.→ Before/after figures
  11. 15:25–16:00Standard, actions and report-outWrite the new standard, list open points with owners and dates, show the result to the sponsor.→ Standard, action list, decision

Ends 16:00 · 7 h 30 min incl. breaks

Roles

Who takes part in a Kaizen workshop.

The mix matters more than the number. People who do the work know the real process; one outsider asks the questions insiders stopped asking; the sponsor makes sure good ideas are not stopped later.

Roles in a Kaizen workshop
RoleWhoJob in the workshop
SponsorThe manager who owns the processExplains why the problem matters, removes obstacles, decides at the report-out
FacilitatorLean coach, CI manager or a trained team leadRuns agenda and methods, keeps time, stays neutral on solutions
Process team (3–5)People who do the work, from every shiftKnow the real process, test the ideas, will run the new standard
Fresh eyes (1)Someone from another areaAsks the “naive” questions, spots what insiders take for granted
Support (on call)Maintenance, IT, quality, safetyMake changes possible on the day instead of weeks later

Methods

Which method for which phase.

You do not need all of them. For a half-day workshop, a gemba walk, sticky notes for the waste, 5 Whys and an impact/effort grid are enough.

Kaizen workshop methods by phase
PhaseMethodTimeYou need
UnderstandGemba walk with time observation30–60 minStopwatch or phone, observation sheet
UnderstandSpaghetti diagram of the walking paths15–20 minFloor plan, pens
UnderstandProcess map on the wall (a simple value stream)30–45 minBrown paper, sticky notes
AnalyseWaste walk with the 8 wastes20–30 minSticky notes, one colour per waste
Analyse5 Whys10 min per problemFlip chart
AnalyseFishbone (Ishikawa) diagram20–30 minFlip chart
IdeasSilent brainstorming (brainwriting)15–20 minCards, pens
IdeasImpact/effort grid10–15 minA grid on the wall
TryPDCA trial at the gemba45–90 minMaterials, tape, the people who do the work
SustainOne-page standard work with photos30–45 minCamera, a template

Facilitation

8 facilitation tips for a Kaizen workshop.

The facilitator owns the method, not the solution. These habits keep the energy up and the result in the hands of the team. More tips for trainers are in our guide to facilitating Lean simulations.

  1. 01

    Start at the gemba

    Ten minutes at the real process beat an hour of slides. Show the problem, then explain the method.

  2. 02

    Silent first, then talk

    Everyone writes ideas alone before the discussion, so the loudest voice does not decide.

  3. 03

    Keep a parking lot

    Topics outside the scope go on a flip chart. Nothing gets lost, nothing derails the day.

  4. 04

    Timebox everything

    Show the clock for every block. A short deadline creates focus and quick decisions.

  5. 05

    Try, don’t debate

    When two ideas compete, test both for one cycle. The figures settle it.

  6. 06

    Same measurement twice

    Measure after the change exactly as before, with the same people and the same method.

  7. 07

    Let the team present

    At the report-out the team speaks, not the facilitator. That builds ownership.

  8. 08

    Say thank you by name

    Name what each person contributed. People come back to the next workshop.

Checklist

Kaizen workshop preparation checklist.

Copy the checklist into your notes, an e-mail or a ticket and fill in the [brackets]. Most workshops that go wrong were lost in the preparation.

Kaizen workshop preparation

Kaizen workshop: [process]

Target: [one sentence with a number and a date]

Two weeks before:

Problem and target agreed with the sponsor: [name]

Team invited and released from normal work: [names]

Support on call: maintenance [name], IT [name], quality [name]

Baseline figures collected: [lead time / defects / search or changeover time]

30-day review booked: [date]

One week before:

Room booked close to the gemba, production or the office informed

Agenda sent to everyone (agenda builder on leanactivity.com/kaizen-workshop)

Safety rules and PPE for people from other areas

Materials: sticky notes in three colours, markers, flip chart, brown paper, tape, stopwatch or phone

On the day:

Current standard or work instruction printed

Parking lot flip chart for topics outside the scope

Camera or phone for before/after photos

Within 24 hours after:

Action list with owners and dates sent to the team and the sponsor

New standard posted at the workplace

After the workshop

The 30 days after a Kaizen workshop.

The workshop ends in the afternoon; the improvement has to survive the next month. One short check a week is enough. For a larger rollout with several workshops, see our continuous improvement training programme.

  1. Lock in the standard

    • Post the one-page standard at the workplace
    • Train every shift, including the people who were not in the workshop
    • Measure the key figure every day
    • Finish the quick actions from the list
  2. Close the actions

    • A 15-minute check at the team board once a week
    • Every owner reports on their action
    • Adjust the standard where it does not work in practice
    • Collect new ideas instead of losing them
  3. Check and decide

    • Measure again and compare with the target
    • Show the result to the sponsor
    • Decide: keep, adjust or roll out to other areas
    • Choose the next problem, and celebrate

Common mistakes

6 mistakes that waste a Kaizen workshop.

  • The scope is too big

    “Improve assembly” cannot be finished in a day. Cut the scope until it fits the time.

  • It stays in the meeting room

    Without the gemba, the team improves the process it imagines, not the real one.

  • The people who do the work are missing

    Managers and planners alone design solutions that the shop floor does not accept.

  • The solution is decided beforehand

    If the outcome is fixed, the workshop is a presentation. People notice.

  • No figures before and after

    Without a measured start, nobody can prove the improvement, and the next workshop gets no budget.

  • No follow-up

    Without a standard and a review date, the process slides back within weeks.

Planning a longer format with layout changes? Our guide to the Kaizen event covers the charter, a five-day plan and the ROI calculation for management. For Lean in administration, see Lean office.

LeanActivity

Start your Kaizen workshop with a Lean game.

The hardest part of a Kaizen workshop is the first hour: people arrive from their daily work and have to see their own process with new eyes. A short Lean game solves that. The team runs a chaotic factory, feels the waiting, searching and rework, makes one change and sees the figures improve.

After 30 to 60 minutes everyone speaks the same language for waste and flow, and the walk to the gemba starts with energy instead of slides.

The Online Game demo runs in the browser, no installation.

FAQ

Kaizen workshops: common questions.

What is a Kaizen workshop?

A Kaizen workshop is a short, focused session, usually half a day to two days, in which the people who do the work improve one process together. They define a measurable target, observe and time the real process, find the waste and its root causes, try the best ideas straight away and end with a new standard and an action plan.

What is the difference between a Kaizen workshop and a Kaizen event?

The terms overlap: the Lean Enterprise Institute uses Kaizen workshop, Kaizen event and Kaizen blitz for the same format. In practice, many companies call the shorter format of half a day to two days a Kaizen workshop and the classic three to five day format with equipment or layout changes a Kaizen event.

How long should a Kaizen workshop be?

Half a day is enough for one small, well-defined problem, such as the search time at one workstation. One day suits one process step, two days a whole process. If machines or layouts have to move, plan a three to five day Kaizen event instead.

Who should attend a Kaizen workshop?

Five to eight people: the people who do the work, ideally from every shift involved, one person from another area who brings fresh eyes, and a facilitator. Support functions such as maintenance, IT or quality should be on call, and the sponsor opens the workshop and joins the report-out.

What is a typical Kaizen workshop agenda?

Welcome and target, a short Lean game or input on the basics, observing the current state at the gemba, mapping the process and marking the waste, root causes, ideas and choice, trying the best ideas and measuring again, and finally the new standard, an action plan and a short report-out to the sponsor.

What do you need to prepare for a Kaizen workshop?

A problem and target in one sentence, a sponsor, a team released from normal work, support functions on call, baseline figures, a room close to the process and materials: sticky notes, markers, flip chart, brown paper, a stopwatch or phone and the current standard. Book the 30-day review before you start.

What happens after a Kaizen workshop?

The new standard is posted at the workplace and every shift is trained. Open actions get an owner and a date and are checked every week. After 30 days the team measures again against the target, reports to the sponsor and decides on the next problem.

Can you run a Kaizen workshop online?

Partly. Office and service processes can be mapped and improved in a video call with a shared whiteboard, and the kick-off can be an online Lean game. Shop-floor processes still need people at the gemba to observe, time and try the changes.

How do you make a Kaizen workshop engaging?

Start at the gemba instead of with slides, open with a short Lean game so everyone experiences waste first-hand, let people write silently before they discuss, try ideas instead of debating them and let the team, not the facilitator, present the results.

Start your next Kaizen workshop with a game.

Play the free demo of the LeanActivity Online Game: a chaotic factory, a team and the first improvement workshop, right in your browser.
See the Online Game