OEE Calculator.
Calculate Overall Equipment Effectiveness in seconds and see whether availability, performance or quality costs you the most.
OEE
76 %
Availability × Performance × Quality
Availability
90.2 %
Performance
87.8 %
Quality
96.1 %
The calculator runs in your browser; nothing you enter is sent or stored.
The OEE formula
OEE = Availability × Performance × Quality. Each factor describes one kind of loss, so OEE does not only tell you how effective a machine or line is, but also where to start improving.
| Factor | Formula | Losses it shows |
|---|---|---|
| Availability | Run time ÷ planned production time | Breakdowns, changeovers, waiting for material |
| Performance | (Ideal cycle time × total count) ÷ run time | Small stops, reduced speed |
| Quality | Good count ÷ total count | Scrap and rework, start-up losses |
Worked example
| Step | Calculation | Result |
|---|---|---|
| Run time | 480 min planned − 47 min downtime | 433 min |
| Availability | 433 ÷ 480 | 90.2 % |
| Performance | (30 s × 760 units) ÷ (433 min × 60) | 87.8 % |
| Quality | 730 good ÷ 760 total | 96.1 % |
| OEE | 90.2 % × 87.8 % × 96.1 % | 76.0 % |
The six big losses behind OEE
| OEE factor | Loss | Example |
|---|---|---|
| Availability | Breakdowns | A drive fails and the line stops |
| Availability | Setups and adjustments | Changeover between two product variants |
| Performance | Small stops | A sensor blocks the conveyor for a few seconds, many times a shift |
| Performance | Reduced speed | The machine runs below its rated speed to avoid problems |
| Quality | Start-up losses | The first parts after a changeover are out of tolerance |
| Quality | Production rejects | Scrap and rework during stable production |
How to improve OEE
- Measure honestlyAgree on definitions for planned time, downtime and ideal cycle time, and record losses where they happen.
- Attack the biggest factor firstThe lowest of the three factors usually hides the biggest and cheapest improvement.
- Shorten changeoversUse SMED to move setup work outside the stop and cut what is left.
- Prevent defects at the sourceError proofing with Poka-Yoke raises quality without extra inspection.
- Make losses visible dailyShow OEE and its top losses on the team board and discuss them in the daily meeting.
- Find the pace your customer needs with the takt time calculator.
Frequently asked questions.
How do you calculate OEE?
OEE = Availability × Performance × Quality. Availability is run time divided by planned production time, performance is ideal cycle time times total count divided by run time, and quality is good count divided by total count.
What is a good OEE score?
A figure of 85 % is often quoted as world-class for discrete manufacturing, but values depend strongly on the industry and how losses are counted. Compare a machine or line first with its own baseline and track the trend.
Why is my performance above 100 %?
Usually the ideal cycle time is set too high, or the counts include units from outside the measured period. The ideal cycle time should be the fastest time the equipment can achieve, not the planned or average time.
Are changeovers counted as downtime?
In most OEE definitions, yes: changeovers and setups reduce availability. That is why SMED, which shortens changeovers, is one of the most direct ways to improve OEE.
What is the difference between OEE and productivity?
OEE measures how well equipment uses the time it is planned to run, split into availability, performance and quality losses. Productivity usually relates output to an input such as labour hours and does not show where the losses come from.