LeanActivity.

OEE Calculator.

Calculate Overall Equipment Effectiveness in seconds and see whether availability, performance or quality costs you the most.

Shift time minus planned breaks

Breakdowns, changeovers, waiting for material

Fastest possible time for one unit

All units produced, good and bad

Units right first time, without rework

OEE

76 %

Availability × Performance × Quality

Availability

90.2 %

Performance

87.8 %

Quality

96.1 %

The calculator runs in your browser; nothing you enter is sent or stored.

The OEE formula

OEE = Availability × Performance × Quality. Each factor describes one kind of loss, so OEE does not only tell you how effective a machine or line is, but also where to start improving.

The three OEE factors and how they are calculated
FactorFormulaLosses it shows
AvailabilityRun time ÷ planned production timeBreakdowns, changeovers, waiting for material
Performance(Ideal cycle time × total count) ÷ run timeSmall stops, reduced speed
QualityGood count ÷ total countScrap and rework, start-up losses
The three OEE factors and how they are calculated

Worked example

Worked example with the default values of the calculator
StepCalculationResult
Run time480 min planned − 47 min downtime433 min
Availability433 ÷ 48090.2 %
Performance(30 s × 760 units) ÷ (433 min × 60)87.8 %
Quality730 good ÷ 760 total96.1 %
OEE90.2 % × 87.8 % × 96.1 %76.0 %
Worked example with the default values of the calculator

The six big losses behind OEE

The six big losses grouped by OEE factor
OEE factorLossExample
AvailabilityBreakdownsA drive fails and the line stops
AvailabilitySetups and adjustmentsChangeover between two product variants
PerformanceSmall stopsA sensor blocks the conveyor for a few seconds, many times a shift
PerformanceReduced speedThe machine runs below its rated speed to avoid problems
QualityStart-up lossesThe first parts after a changeover are out of tolerance
QualityProduction rejectsScrap and rework during stable production
The six big losses grouped by OEE factor

How to improve OEE

  1. Measure honestlyAgree on definitions for planned time, downtime and ideal cycle time, and record losses where they happen.
  2. Attack the biggest factor firstThe lowest of the three factors usually hides the biggest and cheapest improvement.
  3. Shorten changeoversUse SMED to move setup work outside the stop and cut what is left.
  4. Prevent defects at the sourceError proofing with Poka-Yoke raises quality without extra inspection.
  5. Make losses visible dailyShow OEE and its top losses on the team board and discuss them in the daily meeting.

Frequently asked questions.

How do you calculate OEE?

OEE = Availability × Performance × Quality. Availability is run time divided by planned production time, performance is ideal cycle time times total count divided by run time, and quality is good count divided by total count.

What is a good OEE score?

A figure of 85 % is often quoted as world-class for discrete manufacturing, but values depend strongly on the industry and how losses are counted. Compare a machine or line first with its own baseline and track the trend.

Why is my performance above 100 %?

Usually the ideal cycle time is set too high, or the counts include units from outside the measured period. The ideal cycle time should be the fastest time the equipment can achieve, not the planned or average time.

Are changeovers counted as downtime?

In most OEE definitions, yes: changeovers and setups reduce availability. That is why SMED, which shortens changeovers, is one of the most direct ways to improve OEE.

What is the difference between OEE and productivity?

OEE measures how well equipment uses the time it is planned to run, split into availability, performance and quality losses. Productivity usually relates output to an input such as labour hours and does not show where the losses come from.

See losses before they cost you OEE.

In a Lean game your team experiences waiting, changeovers and defects first-hand, and learns to remove them.