Definition
Muda is the Japanese word for waste. In Lean it means any activity that uses time, effort or resources but adds no value from the customer’s point of view. Lean groups it into eight types of waste, often remembered with the acronym TIMWOODS.
What Muda means
Taiichi Ohno described seven types of waste as part of the Toyota Production System. Lean practitioners outside Toyota later added an eighth: the unused skills and ideas of employees. Removing Muda is at the heart of Lean, because waste makes a process slower and more expensive without making anything better for the customer.
Lean distinguishes three kinds of activity: value-adding work that the customer is willing to pay for, necessary non-value-adding work such as legally required checks, and pure waste that can be removed. In most processes, value-adding work is only a small part of the total lead time.
The 8 wastes (TIMWOODS)
- Transport: moving parts or documents more than necessary, for example by forklift across the hall to a distant station.
- Inventory: more material, work in progress or finished goods than needed, such as full pallets between every station.
- Motion: unnecessary movements of people, for example walking to a shared tool cabinet or bending for parts on the floor.
- Waiting: people or machines waiting for material, information, approvals or a repair.
- Overproduction: producing more or earlier than the customer needs. Ohno saw it as the worst waste, because it creates many of the others.
- Overprocessing: doing more than the customer requires, such as polishing a hidden surface or entering the same data twice.
- Defects: scrap, rework and corrections, including wrong invoices and incomplete forms in the office.
- Skills (unused talent): not using the knowledge and ideas of the people who do the work.
How to find and remove waste
- Go and seeObserve the process at the Gemba and follow one product or one document from start to finish.
- Map the flowDraw the steps, the waiting times and the stock with value stream mapping to see where time is lost.
- Name the wasteMark each step as value-adding, necessary or waste, using the eight types as a checklist.
- Remove the causeUse tools such as 5S, one-piece flow, SMED or Poka-Yoke to remove the cause, not just the symptom.
- Standardise and repeatMake the improvement the new standard and look again: waste comes back when nobody watches.
Muda, Mura and Muri
Lean names two more sources of loss next to Muda. Mura is unevenness, for example a workload that swings between overtime and idle time. Muri is overburden: asking people or machines to work beyond a reasonable limit. Unevenness and overburden often create waste, so removing Muda alone is not enough; Heijunka levels the load and tackles the cause.
Go deeper
Muda: questions and answers.
What does TIMWOODS stand for?
TIMWOODS is a memory aid for the eight wastes: Transport, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects and Skills (unused talent).
What is the worst of the 8 wastes?
Taiichi Ohno called overproduction the worst waste, because producing too much or too early creates inventory, transport and waiting, and hides defects at the same time.
Are there seven or eight wastes?
Ohno described seven wastes. The eighth, unused skills or talent, was added later by Lean practitioners outside Toyota and is now widely used.