LeanActivity.

LeanActivity Online Game

The Lean Factory Game. Now online.

Turn a chaotic factory into a Lean one in two hours, together and right in the browser. Led by a moderator, for 2 to 20 players. No installation, no setup, available instantly.

See what your team learns
2–20 players with a moderator2-hour Lean trainingRuns in your browser

Trusted by 1500+ Lean professionals and production managers worldwide.

Inside the game

A real factory. In your browser.

Every player takes a job in a factory that builds cordless screwdrivers in two models: one of the four stations or the logistics. What happens in one place is felt everywhere else.

The whole Lean hall from above: one line in the middle, the route train on its loop, the supermarket racks, the red tag area and the truck at the shipping ramp
Round 12
  1. 1The lineFour stations build the drill: housing and motor, battery, chuck and test, packing.
  2. 2Route trainSupplies every station on a fixed loop instead of a forklift chasing orders.
  3. 3SupermarketRacks with the parts for each station, picked by the route train.
  4. 4Red tag areaEverything sorted out in the 5S round waits here for a decision.
  5. 5ShippingCustomer pallets leave for the truck. Every late pallet shows in delivery reliability.
  • Round 1 · Station 1
    Round 1 of the LeanActivity Online Game from the player at station 1: the workbench, mesh boxes far away and the game's interface with orders and the shift clock

    At the bench

    Grab the parts, assemble, pass the unit on. In the chaotic first shift every walk to a mesh box costs time.

  • Round 12 · Logistics
    Round 12: the logistics player stops the route train at station 1, and the driver's bar shows which rack to restock next

    Driving the route train

    One player per team runs the logistics: the forklift at first, in the last shift the route train on its fixed loop.

  • Round 5 · SMED
    The SMED round: over three runs the changeover at station 1 drops from 20 seconds to 12 and then to 1 second

    Cut the changeover

    Take the changeover apart, prepare outside the stop and watch it drop from 20 seconds to one.

  • Round 9 · Poka-Yoke
    The Poka-Yoke round: the team chooses one option per station, from a checklist at the bench to a housing with a guide groove

    Stop defects at the source

    Compare the options for every station and pick the one that makes the mistake impossible.

  • Round 12 · All shifts
    Results after round 12: eight metrics for the shifts of rounds 1, 4, 7, 10 and 12, each with its trend since round 1

    Every shift compared

    Eight metrics for all five shifts side by side, from output and delivery reliability to rework and walking time.

  • Solo · Certificate
    The certificate a player receives after completing the LeanActivity Online Game solo, with name, training and verification number

    A certificate for every player

    Whoever completes the game solo receives a personal certificate with a number anyone can verify online.

Two ways to play

A 2-hour team training. Or solo, at scale.

Run the game as a moderated workshop for up to 20 players, or let every employee play it alone and finish with a certificate. Both work in the browser, with nothing to install.
The moderator's lobby of an open session: join link, four-digit code and QR code, three teams with players and botsTeam

Team workshop · multiplayer

A complete Lean training in about 2 hours

players
2–20
players
training
~2 h
training
join code
4-digit
join code
  • Teams of 5, led by a moderator, in the room or remote
  • No installation and no sign-up: players join with the code
  • From the chaotic first shift to a Lean line in one session
The certificate of a solo game: name, training, company, date and a verification number with QR codeSolo

Solo with bots · certificate

Train your whole organisation, one player at a time

per game
1 + bots
per game
per person
1 code
per person
certificate
PDF
certificate
  • Every employee plays alone, bots run the other jobs in the factory
  • A personal one-time code, no account needed
  • Pause at any time and continue later, even on another device
  • A certificate with a verification number at the end

Included in every plan: 100, 250 or 500 solo games a year. See the plans

Why online

Lean training without the logistics.

Everything that makes the LeanActivity Factory Game work, now in your browser: the same aha moments, without the kit, the setup and the travel.

  • Available instantly

    Buy today, train today. No shipping, no game kit, no waiting for a delivery.

  • No installation, no setup

    Players open the game in their browser and join. Nothing to install, nothing to build up, no room to prepare.

  • Remote or in the room

    Every player joins from their own computer: in the training room, at home or at another site.

  • A complete training in 2 hours

    From chaos to flow in one session, with measurable results after every shift.

  • Made for a moderator

    One host leads the session, in the training room or in a video call such as MS Teams.

  • 2 to 20 players in teams of 5

    Up to four teams, each running its own factory, all at the same time.

  • Bots fill the free seats

    Fewer players? Bots take over the free stations. To try the game, you can even play alone.

How it works

From chaos to flow in 12 rounds.

Five shifts in which your team produces, and seven workshops in which it changes the factory. Your team does not listen to Lean. It plays Lean, sees the results and wants the same at work.
How a session works
  1. 01
  2. 02
  3. 03
  4. 04
  5. 05
  6. 06
  7. 07
  8. 08
  9. 09
  10. 10
  11. 11
  12. 12
5 shifts: the team produces7 workshops: the team improves
  1. Round 1: the forklift brings a mesh box through the cluttered hall while an operator stacks cartons at station 4
    01Shift

    The chaotic factory

    Mesh pallets all over the hall, long walks and a forklift that cannot keep up. Your team runs the first shift and feels every problem.

  2. Round 2: everything sorted out in 5S stands with red tags on the red tag area
    02Workshop

    5S

    Everything that does not belong goes to the red tag area, and every station tidies up.

  3. Round 3: the whole hall from above with the stations and material still scattered
    03Workshop

    Lean layout

    On the hall plan the team pulls the scattered stations together into one line. The walking distance per unit drops sharply.

  4. Round 4: stations 1 to 3 side by side in the new line, pallets between them, the forklift supplying station 1
    04Shift

    The new line

    The second shift runs in the new layout: tidy stations, short ways, pallets between the stations.

  5. Round 5: changing over at station 1 with the one-touch slide
    05Workshop

    SMED

    Changing over between the Light and Pro models costs time. With a shadow board or a one-touch slide, 20 seconds become 12 or even 1.

  6. Round 6: station 1 puts the drill on the roller conveyor to station 2
    06Workshop

    Plan one-piece flow

    Roller conveyors replace the pallets between the stations: each unit goes on to the next station as soon as it is done.

  7. Round 7: one-piece flow, the drills roll on conveyors from station to station
    07Shift

    One-piece flow

    Units roll from station to station one by one. No more piles of half-finished work in between.

  8. Round 8: the team watches station 1 during the live time study, while the chart of seconds per station grows step by step
    08Workshop

    Time study & line balancing

    The team records the work content live at every station, then moves work steps until every station works below the takt.

  9. Round 9: station 1 close up, the housing sits in a form fixture and the motor waits beside it
    09Workshop

    Poka-Yoke

    A motor goes in the wrong way round. The team tests three countermeasures and picks the one that makes the mistake impossible.

  10. Round 10: the balanced line with roller conveyors between the stations
    10Shift

    The balanced line

    The balanced, error-proofed line runs at an even pace. Every station has about the same amount of work.

  11. Round 11: the route train at the supermarket racks
    11Workshop

    Plan the route train

    The racks move to a fixed route, and a route train brings the parts from the supermarket instead of the forklift.

  12. Round 12: the route train stops at the racks of station 1
    12Shift

    The Lean factory

    The final shift: the route train supplies every station on its loop. Now compare the numbers with your first shift.

The transformation

Watch your factory change.

The same hall, the same people, the same product. Only the way you work changes, and the numbers follow.
Round 12 of the LeanActivity Online Game: one line in the middle of the hall, supplied by the route train on its loop
Round 1 of the LeanActivity Online Game: stations, mesh boxes and clutter scattered across the hall
Round 1Round 12

Drag to compare the same hall in round 1 and round 12.

  1. Round 1: Mesh pallets scattered across the hall

    Round 12: Every part within reach in small boxes

  2. Round 1: Long walks for every single part

    Round 12: Stations side by side: a few steps instead of the whole hall

  3. Round 1: Piles of half-finished units between stations

    Round 12: One-piece flow without buffers

  4. Round 1: A forklift that is always somewhere else

    Round 12: A route train on a fixed, predictable loop

  5. Round 1: Nobody sees where the factory loses time

    Round 12: Status and problems visible to everyone

The result: higher output with less effort, measured after every shift.

Measured after every shift

The numbers show what Lean is worth.

After every shift the results screen compares your factory with the shift before: eight metrics, and how the team spent its working time, split into value-adding time and waste.
  • Output
  • Delivery reliability
  • First delivery
  • Buffer stock
  • Value-adding time
  • Rework
  • Changeover time
  • Walking and transport
Results · Round 12
The results screen after round 12 in the LeanActivity Online Game: output, delivery reliability, first delivery and buffer stock compared with round 10, and the team working time split into value-adding time and waste

Real Lean tools, not slides

Time study and line balancing, live.

In round 8 the team records the work content at every station with the stopwatch, while the chart of seconds per station grows step by step. Then they move work steps until every station works below the takt time.
How a session works
Line balancing · Round 8
Round 8 of the LeanActivity Online Game: the team watches station 1 during the live time study, while the chart of seconds per station grows step by step

What your team learns

12 Lean tools, put into practice.

Every tool is introduced when the factory needs it, so players understand why it matters before they use it.

  • 5S

    Sort, set in order, shine: clear out what does not belong and give every part its place.

  • Lean Layout

    Move stations, pallets and paths until material flows and walking distances shrink.

  • Visualization

    Make status, flow and problems visible at a glance for everyone on the floor.

  • 8 Types of Waste

    Spot transport, inventory, motion, waiting, overproduction, overprocessing, defects and unused talent.

  • Continuous Improvement

    Run, measure, improve, repeat: every shift builds on the one before.

  • SMED

    Cut changeover times so that small batches and a fast response become possible.

  • Poka-Yoke

    Error-proof the work so that mistakes cannot happen in the first place.

  • Obeya

    One shared room for KPIs, problems and decisions: the team steers the factory together.

  • Route Train

    A milk run supplies every station on a fixed route instead of a forklift chasing orders.

  • Small Material Boxes

    Replace bulky mesh pallets with small boxes right at the point of use.

  • One-Piece Flow

    Pass units on one by one instead of in batches and watch the lead time drop.

  • Buffer Elimination

    Remove the piles between stations and bring the real bottlenecks to light.

Made for

Everyone who wants Lean to stick.

Whether you train others or lead the change yourself: the Online Game gives your people the experience that slides cannot.
Close-up of station 2: the operator screws on the chuck, the roller conveyor from station 1 in the background
  • Lean trainers & consultants

    Run engaging Lean workshops anywhere, without shipping or carrying a kit. Ready the moment your client is.

  • Operations & CI managers

    Build a shared Lean language across shifts, sites and departments, and kick off your next improvement project.

  • Universities & academies

    Let students experience Lean instead of reading about it, in class or as a remote session.

  • Remote & hybrid teams

    Everyone plays from their own computer, wherever they are. One factory, one team.

Choose your format

Online or on the table.

Both games teach Lean by doing. Pick the format that fits your team, or combine them.
The station sign “Station 1” above the workbench in the LeanActivity Online Game, the operator at work, Light and Pro mesh boxes in frontNew

Online · in the browser

from €299 / month

LeanActivity Online Game

players
2–20
players
training
~2 h
training
installs
0
installs
  • Led by a moderator, in the room or remote
  • No installation and no sign-up for players
  • Available instantly, no setup
  • Solo mode with bots and a certificate
The physical LeanActivity Factory Game: figures at the assembly stations on the table

Physical · on the table

€3,300 per kit

LeanActivity Factory Game

participants
6–16
participants
session
4 h
session
shipped worldwide
1 kit
shipped worldwide
  • Hands-on around one table
  • Physical training kit, shipped worldwide
  • Video-guided facilitation

Questions & answers

Good to know.

The questions trainers and Lean managers ask us most often about the Online Game.

Something else on your mind?

Ask us directly. We are happy to help you choose the right format.

What do players need?

A computer with a modern browser and an internet connection. There is nothing to install and nothing to set up. The game is designed for desktop and laptop screens.

How many people can play?

From 2 to 20 players in teams of 5, led by a moderator who hosts the session, for example in an MS Teams call. Bots take over every station nobody plays, so a smaller group always runs the complete factory. To try the game, you can also play alone.

How long does a training take?

About two hours, from the chaotic first shift to the Lean factory, including the discussions between the rounds.

How does a session work?

A moderator hosts the session, in the room or in a video call such as MS Teams. The players join with a link or a code and play five shifts and seven improvement workshops in teams of 5. Step by step: how the Online Game works.

Which Lean tools are covered?

Your team puts these methods into practice:

  • 5S
  • Lean Layout
  • Visualization
  • 8 Types of Waste
  • Continuous Improvement
  • SMED
  • Poka-Yoke
  • Obeya
  • Route Train
  • Small Material Boxes
  • One-Piece Flow
  • Buffer Elimination
Can we play remotely?

Yes. Every player joins from their own computer, in the office, at home or at another site. The moderator leads everyone through a video call, for example in MS Teams.

Can employees play alone and get a certificate?

Yes. With a personal one-time code, every employee can play the complete game alone: bots run the other jobs in the factory. Players can pause and continue later, even on another device, and receive a personal certificate with a verification number at the end. Every plan includes solo games with certificate: 100 (Starter), 250 (Team) or 500 (Enterprise) a year.

Which languages are available?

The game is available in English and German.

Can I try the game before buying?

Yes. Get free access to the demo with the "Play the Free Demo" button: you start in the chaotic factory, right in your browser.

How do we buy the Online Game for our team?

With a monthly plan: Starter, Team or Enterprise, depending on how many people play at the same time and how many solo games with certificate you need a year (100, 250 or 500). See the Online Game prices. We are happy to help you choose: contact LeanActivity.

Pricing

Plans for your team.

One monthly plan for your team: unlimited trainings and participants, all game content. Plans differ in how many people play at the same time and in how many solo games with certificate are included per year.

LeanActivity Online Game.

Online

Starter

€299per month

Monthly fee for up to 5 players at the same time, in the browser, plus 100 solo games a year that employees play on their own with bots and finish with a certificate. No installation, no setup.

  • 5 concurrent players (1 team of 5)
  • 100 single-player games with certificate per year
  • Unlimited trainings
  • Unlimited different participants
  • All game content

LeanActivity Online Game.

Online

Team

€399per month

Monthly fee for up to 10 players at the same time, in the browser, plus 250 solo games a year that employees play on their own with bots and finish with a certificate. No installation, no setup.

  • 10 concurrent players (2 teams of 5)
  • 250 single-player games with certificate per year
  • Unlimited trainings
  • Unlimited different participants
  • All game content

LeanActivity Online Game.

Online

Enterprise

€499per month

Monthly fee for up to 20 players at the same time, in the browser, plus 500 solo games a year that employees play on their own with bots and finish with a certificate. No installation, no setup.

  • 20 concurrent players (4 teams of 5)
  • 500 single-player games with certificate per year
  • Unlimited trainings
  • Unlimited different participants
  • All game content

Prices are monthly fees. Prices for the physical training kits

Ready when you are

Your team, a chaotic factory and two hours. Let's make it Lean.

Play the demo for free, right in your browser. No installation, no setup, no credit card.

Talk to us