SMED

Also known as: Single-Minute Exchange of Die · Quick changeoverLean Glossary · Tools & Methods

Definition

SMED (Single-Minute Exchange of Die) is a Lean method for reducing changeover time: the time from the last good part of one product to the first good part of the next. The goal is a changeover in a single-digit number of minutes, so under ten minutes.

Where SMED comes from

SMED was developed by Shigeo Shingo, who worked with Toyota and other Japanese manufacturers on reducing the changeover of large press dies. His central insight: much of the work during a changeover can be done while the machine is still running, and much of the rest can be simplified.

Short changeovers make small batches economical. That is why SMED is a key enabler of Heijunka, one-piece flow and lower stock. It also raises the availability of a machine and with it the OEE.

The SMED steps

  1. Observe and recordFilm or time a complete changeover and list every activity with its duration.
  2. Separate internal and external workInternal setup can only be done while the machine is stopped; external setup can be done while it runs. Mark each activity.
  3. Convert internal to externalPrepare tools, materials and the next die before the stop, and preheat or pre-assemble where possible.
  4. Streamline internal workReplace bolts with quick clamps, use standard heights and positioning pins, and remove adjustments so the first part is right.
  5. Streamline external workKeep tools on a shadow board or a changeover cart, so nothing has to be searched for.
  6. StandardiseWrite down the new changeover sequence, train it and keep timing it.

SMED example

A packaging machine changes between two bottle sizes. The observation shows that operators stop the machine and only then fetch the new format parts, search for the right tools and adjust the guide rails by trial and error.

After a SMED workshop, the format parts and tools stand ready on a cart before the stop, the guide rails have marked end positions for each size, and two people work in parallel to a fixed sequence. The changeover becomes shorter and, just as important, takes the same time on every shift.

The same thinking works outside the factory: an office team that prepares templates and data before a monthly report starts the work without searching for files.

Common SMED mistakes

  • Starting with expensive technology before separating internal and external work, which costs almost nothing.
  • Measuring only the mechanical change and not the run-up until the first good part.
  • Improving the changeover once without standardising it, so each shift does it differently.
  • Using the time saved to run even bigger batches instead of changing over more often.

Go deeper

SMED: questions and answers.

What does SMED stand for?

SMED stands for Single-Minute Exchange of Die. Single-minute means a single-digit number of minutes, so a changeover of less than ten minutes.

What is the difference between internal and external setup?

Internal setup can only be done while the machine is stopped, such as removing a die. External setup can be done while the machine is still running, such as fetching and preparing the next die.

Does SMED only apply to presses?

No. It applies to any changeover: machines, assembly lines, laboratories, operating theatres and even switching between tasks in an office.