Definition

Takt time is the pace at which a process must finish one unit to meet customer demand. It is calculated as available production time divided by customer demand: 27,000 seconds of available time and a demand of 450 units give a takt time of 60 seconds.

What takt time means

Takt is the German word for beat or rhythm, like the beat a conductor gives an orchestra. In Lean, takt time is the heartbeat of a process: if every step finishes one unit per takt, production matches customer demand without overproduction or delay. Toyota made it a central element of the Toyota Production System.

Takt time is set by the customer, not by the machine. It changes when demand or working time changes, while the time a station actually needs, the cycle time, is a property of the process. Comparing the two shows at once whether a process can keep up with demand.

The takt time formula

Takt time = available production time ÷ customer demand

  • Available production time: the planned working time in a period minus planned breaks, meetings and planned maintenance. Unplanned stops are not subtracted.
  • Customer demand: the number of units the customer needs in the same period.
  1. Working timeOne shift of 8 hours is 480 minutes.
  2. Subtract planned stopsTwo 15-minute breaks and a 10-minute team meeting leave 440 minutes, or 26,400 seconds.
  3. Customer demandThe customer needs 480 units per shift.
  4. Takt time26,400 s ÷ 480 units = 55 seconds. Every station must finish one unit within 55 seconds.

Takt time, cycle time and lead time

  • Takt time: how often the customer needs a unit (set by demand).
  • Cycle time: how long a station actually takes for one unit (set by the process). It should be slightly below takt time.
  • Lead time: how long one unit takes from start to finish, including all waiting.

If the cycle time of a station is above takt, that station is a bottleneck: the line falls behind or needs overtime. Teams then move work steps between stations, a process called line balancing, until every station is below takt, and record the result as standard work. The number of operators needed can be estimated as total work content ÷ takt time.

Common mistakes

  • Confusing takt time with cycle time and calling the speed of a machine its “takt”.
  • Subtracting unplanned downtime from the available time, which hides the losses that OEE should reveal.
  • Never updating takt when demand changes.
  • Balancing stations exactly to takt with no margin, so every small disruption causes a delay.

Go deeper

Takt Time: questions and answers.

What is the difference between takt time and cycle time?

Takt time is the pace the customer demands; cycle time is the time a station actually needs for one unit. To meet demand, every cycle time must be at or slightly below the takt time.

Do you subtract breaks when calculating takt time?

Yes. Planned breaks, meetings and planned maintenance are subtracted from the available production time. Unplanned stops such as breakdowns are not, because they are losses to be fixed.

Is takt time used outside manufacturing?

Yes. Service and office teams use it to plan staffing, for example how often a claims team must finish a case to keep up with incoming work.

Learn Takt Time by playing it.

Lean terms stick when a team experiences them. The LeanActivity games turn them into rounds your team plays, measures and improves.