Heijunka

Also known as: Production levelling · Levelled productionLean Glossary · Waste & Flow

Definition

Heijunka is the Lean principle of levelling production by volume and product mix over a fixed period. Instead of building large batches as orders come in, a company produces a steady, repeating sequence of products, which smooths the workload and reduces stock and overtime.

What Heijunka means

Heijunka is Japanese for levelling. In the Toyota Production System it belongs to the foundation on which the two pillars, Just-in-Time and Jidoka, rest. Customer orders rarely arrive evenly. If production follows every peak and dip, the factory swings between overtime and idle time, and the swings grow bigger with every step back towards the suppliers.

Lean names three enemies of a good process: Muda (waste), Mura (unevenness) and Muri (overburden). Heijunka attacks Mura directly, and with it much of the overburden and waste that unevenness creates.

How Heijunka works

  1. Level the volumeWork out the average demand over a period, such as a month, and produce the same quantity every day instead of following daily swings. A small stock of finished goods absorbs the difference.
  2. Level the mixInstead of building all units of product A, then all of B, mix the products in a short repeating pattern, so every product is made every day.
  3. Shorten changeoversA fine mix needs fast changeovers, which is why Heijunka and SMED go together.
  4. Release work with a Heijunka boxA Heijunka box is a board with one row per product and one column per time slot. Kanban cards in the slots release the work in a fixed rhythm, often called the pitch.

Heijunka example

A line builds three products and can make 80 units a day. Weekly demand is 240 units of A, 80 of B and 80 of C. Without levelling, the line builds A from Monday to Wednesday, B on Thursday and C on Friday. A customer who orders C on Monday waits until Friday, and the stock of A has to last for a whole week.

With Heijunka, the line builds 48 A, 16 B and 16 C every day in the repeating sequence A-A-B-A-C. Every product is available every day, much less finished stock is needed, and the upstream processes see the same demand for parts every day instead of sudden peaks.

The same idea works in an office: a team that handles claims spreads complex and simple cases evenly over the week instead of leaving all complex cases for Friday.

Common pitfalls

  • Levelling without short changeovers: the mix becomes expensive, and teams fall back to large batches.
  • Changing the levelled plan every day to chase orders, which brings the unevenness straight back.
  • Forgetting the buffer: levelled production needs a small, planned stock of finished goods to absorb demand swings.
  • Levelling only final assembly while the upstream processes still run large batches.

Go deeper

Heijunka: questions and answers.

What is a Heijunka box?

A Heijunka box is a scheduling board with a row for each product and a column for each time interval. Kanban cards in the slots tell the process what to produce in each interval, so the levelled mix is released at a steady rhythm.

What is the difference between Heijunka and Mura?

Mura is the problem: unevenness in volume or mix. Heijunka is the countermeasure: a levelled production plan that removes the unevenness.

Does Heijunka work in make-to-order production?

Yes, in an adapted form. The company levels the mix of work it releases to the shop floor, for example by product family or by work content, and uses a short order backlog to smooth the load.

Learn Heijunka by playing it.

Lean terms stick when a team experiences them. The LeanActivity games turn them into rounds your team plays, measures and improves.