Visual Management: Boards, Examples and Free Templates

Boards, floor markings, andon lights and kanban cards: how visual management makes problems visible in seconds, with examples and templates.

11 min read · By the LeanActivity team

The short answer

Visual management makes the standard and the status of work visible where the work happens, so anyone can see at a glance whether things are normal or not, and act. It rests on three moves:

  1. 1Show the standard

    Floor markings, labels, shadow boards and visual work instructions show where things belong and how the work is done.

    8 tools with examples
  2. 2Show target vs actual

    Boards beside the process compare plan and actual by the hour and by the day, in figures the team writes itself.

    Hour-by-hour board builder
  3. 3Trigger action

    Andon signals, a short daily huddle and an action list turn every red mark into a countermeasure with an owner.

    5 rules for a good board
Copy the board templates below, from the hour-by-hour board to the 5S audit board, and adapt them with your team.

Basics

What visual management is.

Visual management means placing tools, parts, production activities and performance indicators in plain view, so that everyone involved can understand the status of the system at a glance. That is the essence of the definition in the Lean Lexicon of the Lean Enterprise Institute (Lean Lexicon, LEI).

The test is simple: can someone walking past tell within seconds whether the area is running normally, and if not, where the problem is? A pallet in its marked space is normal; a pallet in the walkway is not. A green row on the hour-by-hour board is normal; two red rows call for the team leader.

Visual factory and visual workplace describe the same idea applied to a whole site. The idea works in offices too, where the work is information and even harder to see.

It helps to think of three levels, from informing to preventing:

  • Show

    Signs, labels, boards and work instructions answer “Where is it?” and “What is the plan?” without anyone having to ask.

  • Signal

    An andon light, an empty kanban slot or a red row on the board draws attention to the abnormal the moment it happens.

  • Prevent

    A shadow board with an empty outline or a maximum line on a rack makes the wrong state obvious. The next step is poka-yoke, which makes the error impossible.

Tools

8 visual management tools, with examples.

Most visual workplaces combine the same handful of tools. Start with the ones that answer the questions your team asks most often: Where is it? Are we on plan? Who needs help?

Show the status

1Hour-by-hour production board

Compares planned and actual output for every hour, beside the line, so a shortfall is seen in the hour it happens. The Lean Lexicon calls it a production analysis board and stresses that it is for solving problems, not for scheduling (LEI).

Example

Plan 50, actual 42 for 08:00–09:00, cause written in: “Screw feeder jammed, 8 min”.

Tip

Write the cause in every red row. Figures without causes make a scoreboard, not a tool.

2Team KPI board

One board per team with a handful of measures, often in five columns: safety, quality, delivery, cost and people (SQDCP). It is where the team meets for its daily huddle.

Example

Quality column: defects per day against a target line, plus the top defect of the week with cause and countermeasure.

Tip

One chart per column is enough. Add an action list at the bottom, or the board will only report.

3Kanban board and cards

A kanban is a signal that authorises moving or producing parts in a pull system (LEI). Cards, empty bins or empty marked spaces show what to replenish; a Kanban board shows work waiting, in progress and done.

Example

An empty bin with its card on the rack tells the route train driver to bring exactly one more bin of that part.

Tip

Limit the number of cards. The limit on work in progress is what makes overload visible.

4Andon

An andon shows the status of operations at a glance and signals abnormalities, usually as an overhead board of numbers or lights on the machines, set off by a sensor, a cord or a button. Red means a problem, green normal operation (LEI).

Example

An operator presses the button at station 3; the light turns red and the team leader arrives within the agreed response time.

Tip

Agree who responds and how fast before you install the light. An andon without a response is decoration.

Show the standard

5Floor markings and shadow boards

Lines on the floor show walkways, work areas and the place of every trolley and pallet; a shadow board shows the outline of each tool. Anything missing or out of place stands out immediately.

Example

A marked space for exactly two pallets: a third pallet in the aisle shows overproduction at a glance.

Tip

Mark only what you have sorted first. Lines around clutter fix the clutter in place. The 5S guide covers floor marking colours.

65S board and audit results

Shows the 5S standard of an area with photos, the latest audit score, the trend and the open actions. It keeps 5S from fading after the big clean-up.

Example

Score per S from the last six audits, before and after photos from the same spot, three open actions with owners.

Tip

Let the team audit its own area, joined now and then by someone from outside. Our 5S audit checklist is free.

7Visual standard work and one-point lessons

Work instructions with photos at the station show the sequence and the key points of the current best way (standard work). A one-point lesson explains one thing on one page, mostly with pictures.

Example

A one-point lesson at the press: “Torque checked = paint mark on the bolt”, with photos of right and wrong.

Tip

If people have to read more than a few lines, replace the text with a photo.

8Office visual management

Office work hides in inboxes and systems, so it needs boards even more than the shop floor: a column for each stage, one card per request and a limit on work in progress.

Example

A purchasing team sees on its board that four requests have waited more than three days for approval.

Tip

Show waiting work and its age, not just tasks. More in our Lean office guide.

Examples

Visual management examples by area.

Every area answers the same three questions: what is the standard, where do we stand, and what happens when something is wrong? Choose two or three examples per area, not all of them.

Visual management examples for assembly, warehouse, maintenance, office and any team area
AreaShow the standardShow the statusTrigger action
AssemblyStation signs, visual work instructions, marked places for parts and trolleysHour-by-hour board, lights on the stations, team KPI boardAndon call to the team leader; red rows discussed in the next huddle
WarehouseLabelled locations, marked lanes for goods in, goods out and quarantine, min/max lines on racksShipping board with loads per truck and departure time, marked spaces visibly empty or fullKanban card or empty bin triggers replenishment; a full lane stops the next delivery
MaintenanceShadow boards, labelled spare parts with min/max, lubrication points marked on the machinePlanned versus completed maintenance orders, machine status: running, stopped, waiting for partsFault tag on the machine; overdue orders shown in red at the daily meeting
OfficeTemplates and checklists, one shared folder structure, rules for shared desksKanban board with the age of each request, backlog and lead time on the team boardWIP limit reached: no new work until something is finished; overdue cards raised in the huddle
Any team areaSkills matrix: who is trained for which jobSafety calendar for the month, idea board with new, in test and doneGaps in the skills matrix go into the training plan; every idea gets an owner
Examples from common practice; adapt them to your site.
Factory hall in the LeanActivity Online Game with yellow floor markings, four signed assembly stations and the route train loop
Marked walkways, station signs and a fixed loop for the route train: the improved hall in the LeanActivity Online Game.

Rules

5 rules for a good visual management board.

A good board is a working tool, not a report. Check yours against these five rules; each comes with a quick check you can do at the board today.

1Readable in 5 seconds from 3 metres

Large figures, few words, colour only where it carries meaning. Anyone walking past should see whether the team is on track without stopping to read.

Quick check

Stand three metres away and count to five. Can you say whether the shift is on plan, and where the problem is?

Looks like

Thick marker, one figure per box, a green or red dot at the end of every row.

2Target next to actual

A number on its own says nothing. Every measure needs its target beside it, so the gap, and with it normal or abnormal, is visible at once.

Quick check

Point at any figure on the board. Can a team member tell you what it should be?

Looks like

“Defects today: 3” becomes “Defects today: 3, target 1 or fewer” with a red dot.

3Owned by the team

The team that works with the board decides what goes on it and how it looks. Boards designed elsewhere and hung up for the team are rarely read.

Quick check

Ask anyone in the team what the board is for and what they last changed on it.

Looks like

The team swaps a chart nobody used for a column of open problems with names and dates.

4Updated by the team, at the point of work

The people who do the work write the figures by hand, at fixed times, beside the process. A chart printed weekly in an office shows history, not status.

Quick check

When was the last entry made, and by whom? If the answer is “last week” or “the planner”, the board is wallpaper.

Looks like

The operator at the last station writes the hourly figure; the team leader initials the row.

5Leads to action

Every red mark needs a cause, a countermeasure, an owner and a date. Larger problems go into a structured analysis such as the 5 Whys.

Quick check

Pick the last red mark. What is being done about it, by whom, and by when?

Looks like

Two red hours in a row: the team leader comes to the line; the cause goes on the action list.
Shift results screen in the LeanActivity Online Game with output, delivery reliability, first delivery, buffer stock and the team’s working time
The same idea in a game: after every shift, the LeanActivity Online Game shows the team 8 KPIs, with the history of all rounds.

Board builder

Build your hour-by-hour board.

Enter the shift start, its length and the planned output. The builder spreads the plan over the hours by available minutes, so an hour with a break gets a lower plan, and gives you a board to copy. If the planned output equals customer demand, the pace is your takt time. It runs in your browser; nothing is sent or stored.

1 to 12 hours

Per shift

Set the break minutes in each row of the board. Example values are illustrations: put in your own.

  • Available time

    7 h 15 minafter breaks

  • Plan per full hour

    55.2pieces

  • Pace

    65 sper piece

Hour-by-hour board: your line

Planned output per hour with columns for the actual output and problems
TimeBreakPlanCum.
06:00–07:005555
07:00–08:0055110
08:00–09:0042152
09:00–10:0055207
10:00–11:0027234
11:00–12:0056290
12:00–13:0055345
13:00–14:0055400

The empty columns are filled in by the team during the shift. The copied versions contain all columns: actual, actual cumulative, problem and initials.

Templates

Visual management templates to copy.

Four templates for the most common boards. Copy them into a document, fill in the [brackets] and draw the first version by hand with the team before you order a printed board.

Hour-by-hour board layout

Hour-by-hour board: [line / cell]

Shift: [early / late / night] · Date: [date] · Team leader: [name]

Planned output: [pieces per shift] · Pace: [one piece every x seconds]

Columns:

Time | Plan | Actual | Plan cum. | Actual cum. | Problem / cause | Countermeasure | Initials

Rows (one per hour):

[06:00–07:00] | [plan] | | [plan cum.] | | | |

[07:00–08:00] | [plan] | | [plan cum.] | | | |

[ … until the end of the shift ]

Rules:

Plan figures are written in before the shift starts

The team writes the actual at the end of every hour

Green dot if actual reaches plan, red dot if not

Every red row gets its cause in plain words, e.g. “screw feeder jammed, 8 min”

Two red rows in a row: the team leader comes to the line

The board is reviewed at the shift handover, then wiped

Daily huddle agenda (10–15 minutes)

Daily huddle at the team board: [team]

Time: [hh:mm], standing, 15 minutes at most · Led by: [team leader] · Stand-in: [name]

1. Safety (1 min): incidents or near misses since yesterday? Mark the safety calendar.

2. Yesterday (3 min): quality, delivery and cost against target. What was red, and why?

3. Today (3 min): plan, staffing, changeovers, known risks.

4. Problems (5 min): each new problem gets an owner and a date, or goes to [problem-solving session / 5 Whys].

5. Actions (2 min): actions due today: done, late or help needed?

6. Ideas and thanks (1 min): one improvement idea, one thank-you by name.

Rules:

Starts on time, even if someone is missing

Only facts from the board, no slides

Long discussions go to the parking lot and are held after the huddle

Team KPI board structure (SQDCP)

Team KPI board: [team / area]

Board owner: [team leader] · Updated: [daily at hh:mm] · Huddle: [hh:mm]

Header:

Team name, team photo, a small map of the area

Five columns, one chart each:

Safety: accidents and near misses this month on a calendar [target: 0]

Quality: defects or first-pass yield per day [target: x]

Delivery: output against plan, on-time shipments [target: x %]

Cost: scrap, overtime or downtime per day [target: x]

People: attendance, skills matrix, training plan [target: x]

In every column:

Target line drawn in, figures written by hand

Green or red mark for the last day at the top

Top problem of the week with cause and countermeasure

Bottom row:

Action list: what · who · by when · status

Idea board: new · in test · done

5S audit board layout

5S board: [area]

Area owner: [name] · Audit every [week / month] · Next audit: [date]

Field 1, area map:

Zones of the area with the owner of each zone

Field 2, the standard:

One photo per zone showing how it should look, with the key points marked

Field 3, audit result:

Score per S (Sort, Set in order, Shine, Standardise, Sustain), each up to 20, total up to 100

Trend of the last [6] audits as a simple bar chart

Field 4, latest audit checklist:

The filled-in checklist with findings circled

Field 5, before and after:

Photos taken from the same spot each time

Date on every photo

Field 6, action list:

Finding · owner · due date · done

Field 7, red tags:

Open red-tagged items and the date each decision is due

The 5S board uses the scoring of our free 5S audit checklist: 25 criteria, each S up to 20 points. Red tags and their decisions are explained in the guide to the red tag area.

Introduction

How to introduce visual management.

Start in one pilot area, with the basics first and the boards second. The order matters: a board in a chaotic area only documents the chaos.

  1. Go and see

    • Pick one pilot area with a willing team leader
    • Walk the area: what can a visitor not tell within five minutes?
    • Note the questions people ask every day
    • Take photos of the current state
  2. Show the standard

    • Sort and set in order with 5S, red-tag what is not needed
    • Floor markings, labels and shadow boards for what remains
    • Visual work instructions at the key stations
  3. Board and huddle

    • Design the first board with the team, on paper
    • Start the hour-by-hour board and a team board with three to five measures
    • Hold a daily huddle of 10–15 minutes at the board
  4. Sustain and spread

    • Leaders walk the boards and ask about the red marks (gemba walk checklist)
    • Review each board monthly and remove what nobody uses
    • Roll out to the next area, with the pilot team as guides

Weeks 2 and 3 fit well into a Kaizen workshop: in one or two days the team sorts the area, marks the places and sketches its first board.

Common mistakes

6 mistakes that turn boards into wallpaper.

  • Wallpaper boards

    Charts printed in the office, updated once a month, read by nobody. If no one stands at a board every day, take it down.

  • Too much on one board

    Twenty charts hide the two that matter. Three to five measures per team are plenty.

  • No target, no colour

    Figures without a target cannot show what is abnormal. Draw in the target line.

  • Red without action

    When red marks stay red for weeks, people stop looking. Every red mark needs an owner and a date.

  • Boards far from the work

    A board in the meeting room or a screen in the office is not seen when it matters. Put it beside the process.

  • Blame instead of help

    If red marks lead to blame, the figures soon turn green on paper only. Leaders ask “What do you need?”, not “Who did it?”.

LeanActivity

Practise visual management in a Lean game.

Boards and markings are easy to explain and hard to make stick. People believe in them once they have felt the difference between working blind and seeing the status. In a game, that takes minutes instead of months.

In the LeanActivity Online Game, teams run a 3D factory in the browser. After every shift they see 8 KPIs, from output and delivery reliability to buffer stock, rework and walking and transport, with the history of every round. The 5S workshop with a red tag area and the new Lean layout change what the factory looks like, and the next shift shows what that does to the figures. The Factory Game brings the same experience to the training table.

The Online Game demo runs in the browser, no installation.

FAQ

Visual management: common questions.

What is visual management?

Visual management means putting tools, parts, work in progress and performance indicators in plain view at the workplace, so everyone can see the status at a glance. The aim is that anyone can tell within seconds whether things are normal or not, and that every abnormality leads to action.

What is a visual management board?

A visual management board is a board beside the process that shows targets against actual results, current problems and open actions. Typical examples are the hour-by-hour production board and the team KPI board with safety, quality, delivery, cost and people. The team updates it by hand and meets at it for a short daily huddle.

What are examples of visual management?

Common examples are floor markings for walkways and storage places, shadow boards for tools, labelled locations, kanban cards and bins, andon lights, hour-by-hour boards, team KPI boards, 5S boards with audit results, visual work instructions, one-point lessons and Kanban boards for office work.

What should be on a shop floor board?

Three to five measures with a target next to each, usually covering safety, quality, delivery, cost and people, plus the current problems with their causes and an action list with owners and dates. Anything the team does not use in its daily huddle should come off the board.

What is a visual factory or visual workplace?

Both terms describe visual management applied to a whole site: every area shows its standard and its status, so problems are visible to anyone walking through. It grows area by area, starting with 5S and floor markings and adding boards and signals once the basics are in place.

What is a 5S board?

A 5S board shows the 5S standard of an area with photos, the owner of each zone, the latest audit score and its trend, before and after photos and the open actions. It keeps 5S alive after the first clean-up because everyone can see whether the area is improving or sliding back.

How do you make a good visual management board?

Keep it readable in about five seconds from three metres, put a target next to every figure, let the team design and update it by hand at the point of work, and make sure every red mark leads to a countermeasure with an owner and a date. Review it monthly and remove what nobody uses.

How long should a daily huddle at the board take?

Ten to fifteen minutes, standing at the board. Cover safety, yesterday’s results against target, today’s plan, new problems and open actions. Longer discussions move to a separate problem-solving session so the huddle stays short and starts on time every day.

Does visual management work in the office?

Yes. Office work is invisible in inboxes and systems, so a team board with a column for each stage, one card per request and a limit on work in progress often helps even more than on the shop floor. It shows where requests wait and how long they have been waiting.

Make the status visible, then improve it.