Definition
Just-in-Time (JIT) is the Lean principle of producing and delivering only what is needed, when it is needed and in the amount needed. Each process makes only what the next process has used, which keeps stock low and makes problems visible quickly.
Where Just-in-Time comes from
Just-in-Time is one of the two pillars of the Toyota Production System, next to Jidoka. The phrase is usually credited to Kiichiro Toyoda, and Taiichi Ohno developed it into a working system at Toyota after the Second World War. Ohno took inspiration from American supermarkets, where shelves are refilled only with what customers have taken.
The opposite is push production: every process builds to a forecast and pushes its output to the next step, whether it is needed or not. The result is high stock, long lead times and problems hidden behind piles of material.
The building blocks of JIT
- Takt: produce at the pace of customer demand, expressed as takt time.
- Flow: move products through the process one by one or in small batches, without waiting between steps.
- Pull: a process only produces when the next process signals a need, usually with Kanban cards or empty bins.
- Levelling and short changeovers: a levelled plan and quick changeovers make small, frequent orders economical.
- Supermarkets and route trains: small, controlled stocks near the line, refilled on a fixed route and in a fixed rhythm.
Just-in-Time examples
- Assembly: a route train runs a fixed loop, collects empty bins at the line and brings full ones from the supermarket, so the line holds only a small amount of each part.
- Supplier delivery: a supplier delivers several times a day in small quantities, based on what the plant has used, instead of one big weekly delivery.
- Office: a team prepares the documents for each order on the day it ships instead of preparing a month’s supply in advance that may never be needed.
In each case, stock no longer covers up problems. If a delivery is late or a part is faulty, everybody notices at once, and the problem has to be solved at its cause.
Risks and common mistakes
- Cutting stock before the process is stable. Low stock exposes problems; if nobody solves them, deliveries fail.
- Shifting stock to suppliers instead of reducing it along the whole chain.
- Ignoring supply risks: JIT needs reliable suppliers, and critical parts may need a deliberate buffer.
- Treating JIT as a logistics project only. It also needs stable processes, quality at the source and short changeovers.
Go deeper
Just-in-Time: questions and answers.
What does JIT stand for?
JIT stands for Just-in-Time: producing and delivering the right items, at the right time, in the right amount.
What is the difference between JIT and Kanban?
Just-in-Time is the principle and the goal. Kanban is one of the tools that makes it work: a signal, usually a card or an empty bin, that tells a process what to produce or deliver next.
Does Just-in-Time mean zero stock?
No. JIT aims for the smallest stock that keeps the flow stable. Small, controlled buffers such as supermarkets are part of the system; what JIT removes is the stock that hides problems.